Merced River Corridor Restoration Plan, Phase IV: Dredger Tailings Reach, Merced County, CA Client: California Bay-Delta Authority Ecosystem Restoration Program
Reports
Technical Memo #1: Channel and Floodplain Surveys of the Merced River Dredger Tailings Reach
·Photogrammetry
·Long profile
·Cross-section data (surveys conducted at forty locations)