Merced River Corridor Restoration Plan, Phase IV: Dredger Tailings Reach, Merced County, CA
Client: California Bay-Delta Authority Ecosystem Restoration Program

 

Reports

Channel and Floodplain Surveys

Hydraulic Model

Sediment Transport Model

Volume and Texture Analysis

Mercury Assessment

Conceptual Restoration Design

Baseline Monitoring

Revegetation Experiment

Design Rationale

75% Design and Specification

Environmental Documentation

Plan and Cost Estimate

Post Implementation Monitoring

Groundwater

Home

Technical Memo #3: Sediment Transport Model of the Merced River Dredger Tailings Reach

·         Sediment transport model

 

Single Download

Full Report     (5.0 MB)

 

Separate Downloads

Tech Memo #3    (425 KB)

Figures    (6.9 MB)