Merced River Corridor Restoration Plan, Phase IV: Dredger Tailings Reach, Merced County, CA
Client: California Bay-Delta Authority Ecosystem Restoration Program

 

Reports

Channel and Floodplain Surveys

Hydraulic Model

Sediment Transport Model

Volume and Texture Analysis

Mercury Assessment

Conceptual Restoration Design

Baseline Monitoring

Revegetation Experiment

Design Rationale

75% Design and Specification

Environmental Documentation

Plan and Cost Estimate

Post Implementation Monitoring

Groundwater

Home

Merced River Ranch Channel-Floodplain Restoration: Implementation Plan and Cost Estimate (URS, Corp.)

·         Implementation plan and cost estimate and associated rationale for  implementing channel-floodplain restoration (as designed at the 75% level) using a phased approach.

 

Single Download

Full Report   (9.9 MB)